Pro Screed, Inc. recently completed a major project at MHC in Fort Mill, SC. This extensive job spanned over three months, covering more than 300,000 square feet. Our skilled laser screed operator, Jason, led the effort with exceptional precision.
Located 285 miles from our base, the Fort Mill site posed a logistical challenge. However, our team was committed to delivering top-quality results, regardless of distance. We organized the project meticulously, ensuring smooth operations throughout the three-month period.
Upon arrival, Jason and the crew set up our advanced laser screed equipment. The massive scale of the job required careful planning and coordination. Our laser screed technology ensured each section of the expansive floor was leveled with perfect accuracy.
Concrete trucks arrived in a steady stream, and the pour began. Jason guided the process, ensuring that each pour met the high standards required for the MHC facility. The laser screed adjusted in real-time, providing a consistently level surface across the entire 300,000 square feet.
Despite the project’s size and complexity, our team worked diligently and efficiently. Over the three months, we maintained a steady pace, ensuring that every phase of the pour was completed to perfection. The result was a flawlessly leveled floor, ready to support the operations at MHC.
Pro Screed, Inc. is proud of the work accomplished at MHC in Fort Mill, SC. This project highlights our dedication to quality and our ability to handle large-scale jobs with precision and efficiency. We look forward to bringing our expertise to future projects, no matter the size or distance.